Add debug commands to CLI to diagnose potential bride problems.
Currently we only have a command which validates whether the state of
all the mailboxes reported by IMAP matches what is currently available
on the proton servers.
Ensure that we can handle the rare case that can cause a crash if for
whichever reason we end up with an Address Delete and Message
Create/Update in the same event object.
It is possible, on slower machines, that the new event poll task is not
yet registered and attempts to cancel have nothing to cancel.
In this case, we need the refresh event to cancel the task, at that
point it is guaranteed that the task exists.
When listing all a user's email addresses (e.g. for apple mail autoconf)
we need to exclude disabled addresses. Similarly, we need to remove
them from gluon if using split mode.
This handles the following case:
- event says message was created
- we try to fetch the message but API says the doesn’t exist yet — we skip applying the “message created” update
- event then says message was updated at some point in the future
- we try to handle it but fail because we don’t have the message — we should treat it as a creation
This handles the following case:
- event says message was created
- we try to fetch the message but API says the doesn’t exist yet — we skip applying the “message created” update
- event then says message was updated at some point in the future
- we try to handle it but fail because we don’t have the message — we should treat it as a creation
We don't want to start processing events until those events have
somewhere to be sent to.
Also, to be safe, ensure remove and re-add the gluon user while
clearing its sync status. This shouldn't be necessary.
fix(GODT-2327): Only start processing events once sync is finished
fix(GODT-2327): avoid windows delete all deadlock
fix(GODT-2327): Clear update channels whenever clearing sync status
fix(GODT-2327): Properly cancel event stream when handling refresh
fix(GODT-2327): Remove unnecessary sync abort call
fix(GODT-2327): Fix lint issue
fix(GODT-2327): Don't retry with abortable context because it's canceled
fix(GODT-2327): Loop to retry until sync has complete
fix(GODT-2327): Better sleep (with context)
Updates go-proton-api and Gluon to includes memory reduction changes and
modify the sync process to take into account how much memory is used
during the sync stage.
The sync process now has an extra stage which first download the message
metada to ensure that we only download up to `syncMaxDownloadRequesMem`
messages or 250 messages total. This allows for scaling the download
request automatically to accommodate many small or few very large
messages.
The IDs are then sent to a download go-routine which downloads the
message and its attachments. The result is then forwarded to another
go-routine which builds the actual message. This stage tries to ensure
that we don't use more than `syncMaxMessageBuildingMem` to build these
messages.
Finally the result is sent to a last go-routine which applies the
changes to Gluon and waits for them to be completed.
The new process is currently limited to 2GB. Dynamic scaling will be
implemented in a follow up. For systems with less than 2GB of memory we
limit the values to a set of values that is known to work.
For every update sent to gluon wait and check the error code to see if
an error occurred.
Note: Updates can't be inspect on the call site as it can lead to
deadlocks.